Friday

Devon holiday snaps

  

My beautiful wife and I have been on holiday for the last week, I went back to work today, now its time for some serious work on the workshop and to try and catch-up with framing jobs. We went to Hele bay in Devon, and in the nearest town of Ilfracombe we found a picture framers, I was very happy about this, as you can see from the photo, unfortunately it was closed on Saturdays. It was a nice looking shop, large and spacious, with lots of light from the big windows.

Wednesday

Wood for benches and storage


Most of the panels and timber for the work benches and other fixtures, and the partition wall are all here now and waiting to be put to use.

Saturday

Estate security

 

The workshop is slowly taking shape, I have a big delivery of sheet material and timber coming on Monday which will be used to make three work benches, a large storage racking unit for frames and framed pictures, a display unit for photo and ready-made frames, drying racks, sample displays, and various other workshop fittings. 

Tuesday


Everything is now in, well, almost everything, I still have various other pieces of equipment and fittings in storage but I will give it a few days before collecting them. The next most important job is to get the partition wall fitted, this will be where the roof beam is in the photo above. One side will be for sawing, sanding, spraying, and generally more messy jobs, and the other side will be for mount cutting, mounting, and assembly.  

Frame corner samples



This pile of bin bags is all my frame corner samples, waiting to be sorted out and put on the walls in the reception room, realistically I can't see this being done for 2 or 3 weeks.

Laying the floor

  


I finished laying the laminate flooring in the reception room today, I still need to fit the edging moulding that goes against the skirting and the doorway threshold strips, but at least I can now start organising the layout. 
I have had some problems with the BT phone line and broadband today, which is a nuisance as it has been working fine since my number was moved on Friday, but hopefully that will be sorted tomorrow. I also went to see a sign writer on the industrial estate about getting my signs done. The rest of the day has been spent moving the last of the equipment (saved the heavy stuff until last!) from the old workshop, cleaning it up and painting ready for the new tenant to move in on Thursday. 
5 full days of moving and lifting, and I am worn out and ready for a holiday. The only event more exciting than the new workshop is seeing my jet-setting wife on 11th August, having not seen her for far to long.

Monday

Zak in the bin


My mum and Zak have been helping with the move.

Saturday

    

After over 2 years of planning and building work, I started the move into my new workshop on Friday! Most of the boxes and smaller items were moved on Friday evening, and today most of the other equipment went over, all that remains to be moved is the large items such as benches and various large pieces of equipment. Its going to take a good few weeks to get it all straight and up and running. Tomorrow I will lay the laminate flooring in the office/reception room so this room can be completed as quickly as possible. 

Wednesday

The move begins...

 

The workshop move has started this week, with things being boxed up, ready for the weekend. I should have the keys sometime on Friday so all of the smaller items will be moved over the weekend. Then on Monday and Tuesday the large fittings and equipment can be moved out. The back partition wall of the workshop is being opened up, this leads to another unit which has large double doors, so the bulky items can be taken out through these big doors and then a forklift will take them to the new unit.

Saturday

love is where you find it.


Look for it...

More repairs.....


This swept frame was brought in for some minor repairs to the corners. The last few weeks have been very busy, with no time to even take photos and post them on the blog.

Sunday

Another frame for repair


This Louis XIV style corner and centre frame needs some repairs around the sight edge and sanded frieze, and really just a very good, all round tidy-up.

Frame for repair


This nice antique frame has come in this week for some minor repair work. The rebate is split in places and all four mitres are very loose and wobbly. The bold wave pattern in the central frieze is known as a wave scroll, Vitruvian wave, Greek wave, or running dog pattern. The design is a common classical architectural pattern. The ornaments either side of the wave scroll are more classical patterns known as waterleaf and tongue.

Friday

Main workshop area

 

Only 10 full working days left until the planned completion date, the builders are working flat out, but even so I think it will be more like the 30th July. All of the internal steels still have to be painted with several coats of fire retardant paint, this is quite a big job. I believe this is a relatively new EU building regulation, which is understandable for buildings with several stories but seems a little extreme for a single level workshop.

The office/reception room and kitchen

Thursday

Large water gilded frame and mirror


This large water gilded mirror frame is now finished and collected. The fluted cove frame is 4 1/2" wide, it is water gilded in 23.5ct gold leaf with bronze powdered sides and with a traditional dark ochre painted back edge. The external size is 48" x 75".

The backing is external plywood which has been waterproofed both sides as the mirror will be hanging in a bathroom. This is not the ideal location for a water gilded frame so the gilding has been protected with Lascaux UV protect 3, which is an archival spray varnish which gives a hard wearing, flexible, non-yellowing, and waterproof film. The whole back of the frame and the 6mm MDF corner brackets and blocks supporting the hanging fittings have been sealed with Paraloid B72 (a high quality archival acrylic resin adhesive which is also used in the Lascaux UV protect 3 varnish). The frame is hung with four 12" Z bar hangers and two heavy duty mirror plates. The rebate of the frame has been lined with foam to cushion the mirror and to help reduce the risk of breakage during moving and hanging.

Louis XIII frame


This style of moulding and frame is generally called a Louis XIII, I bought the basic moulding, with the scrolls and flower pattern in a 3m length, it is cut to size on a mitre saw and joined together, then I applied the acanthus leaves over the corners. This hides the mitres and makes it look more handmade. I then sprayed a couple of coats of gesso all over. Next a couple of coats of yellow bole are applied, then red bole is painted on the high lights of the ornament. Bronze powder bound in rabbit skin glue is stippled on the frame, then the high lights are given a rub with an agate burnisher. The final stage is some distressing and colouring over the gold to knock it back and give a softer finish.

Workshop is getting there...

   

I have not had chance to do an update on the workshop for a couple of weeks. The moving date is still hopefully going to be on Monday 26th July. The internal painting is nearly finished, and the reception room walls and ceiling are coming on really well. Next week the electrician starts work.

18th Century portrait framing


Here is a photo of the water gilded frame I was working on a while ago. The painting is by Arthur William Devis, and was painted in the late 18th Century.

A few recent framing jobs


The top photo is of three more Sam Toft pencil drawings, for the big Toft exhibition at John Noott Galleries, opening this weekend. The paper is float mounted on 5mm foamboard over a dark grey mountboard, and framed in a silver/pewter/black frame. 

The second photo is a group of paintings by Jeremy Houghton, again float mounted and framed in a wenge solid wood frame. A spacer keeps the work away from the anti reflective glass.