Friday

Spray booth is up at last!



We finally got round to putting up the spray booth today, its only taken 6 months, and it was in storage for 18 months before that, so it's good to get it in position. There is still the small task of drilling a 16" hole through the back wall, attaching the extraction fan, and fitting the ducting, but hey, one step at a time.

There are still a lot of jobs on the 'to-do list', since moving in 6 months ago, and it has been quite a challenge balancing these jobs around the workshop with getting customers work done.

I have something like 70 gilded frames to make over the next 6 to 8 weeks, so at least now the booth is in position I can have a contained area to spray gesso onto frames, which will greatly increase productivity.