Thursday

My first jobs back at work






These are a few repair jobs I started today. The little swept frame above has a few losses to the compo, then the Barbizon frame has lots of small areas of damage to the plaster ornament, finally the 
pierced Rococo frame has a few losses to the inner ornament. The old label at the top is from the little swept frame.
Two of these frames (the swept and the Barbizon) have been repaired by me before, careless handling by shippers (taking the frames to and from art fairs and exhibitions) has caused the various damage which means they need repairing again.